Jump to content

List of wind farms in Queensland

From Wikipedia, the free encyclopedia

This is a list of wind farms in Queensland, Australia. To be included on the list a wind farm must have a capacity of 10 megawatts (MW) or greater.

As of December 2023, Queensland has six operating wind farms with a total installed capacity of about 1025 MW.

Operational

[edit]
Project name Sponsoring company Coordinates Capacity (MW) Date Notes
Coopers Gap[1][2][3] AGL Energy 26°33′S 151°20′E / 26.55°S 151.33°E / -26.55; 151.33 453 2020;
4 years ago
 (2020)
$850 million investment,[4] 123 turbines
Dulacca Wind Farm Octopus Investments 26°48′S 150°16′E / 26.80°S 150.27°E / -26.80; 150.27 181 2023;
1 year ago
 (2023)
$450 million investment, 43 turbines
Mount Emerald Wind Farm[5] RATCH-Australia
Port Bajool
17°12′S 145°24′E / 17.2°S 145.4°E / -17.2; 145.4 180 2018;
6 years ago
 (2018)
$400 million investment, 53 turbines
Windy Hill Wind Farm Built by Stanwell Corporation, now owned by RATCH-Australia 17°35′32″S 145°31′50″E / 17.5922°S 145.5306°E / -17.5922; 145.5306 12 2000;
24 years ago
 (2000)
$20 million investment, 20 turbines
Kaban Green Power hub Neoen 17°04′S 146°45′E / 17.06°S 146.75°E / -17.06; 146.75 156 2023 Combined with 100 MW battery[6]
Kennedy Energy Park Stage 1[7][8] Windlab 21°S 145°E / 21°S 145°E / -21; 145 43 2021 Combined with 15 MW solar power and 2 MW / 4 MWh Battery.

Projects

[edit]
Project name Sponsoring company Coordinates Capacity (MW) Status Notes
Archer Point Wind Farm Wind Power Queensland 15°35′S 145°19′E / 15.58°S 145.31°E / -15.58; 145.31 120 Feasibility
Clarke Creek Wind Farm[9][10] Lacour 22°46′S 149°32′E / 22.77°S 149.53°E / -22.77; 149.53 800 Feasibility Up to 195 turbines
Crediton Wind Farm[11] Transfield Services 21°12′54″S 148°32′24″E / 21.215°S 148.540°E / -21.215; 148.540 40 Proposed
Crows Nest Wind Farm[12] AGL Energy 27°13′51″S 151°57′35″E / 27.230916°S 151.959666°E / -27.230916; 151.959666 200 Cancelled $270 million investment, 40 turbines. Cancelled by AGL.[13]
Forsayth Wind Farm[14][15] Infigen Energy 18°35′13″S 143°44′45″E / 18.58694°S 143.74583°E / -18.58694; 143.74583 75 Planning approved $250 million investment, 30 turbines
Forest Wind[16][17][18] CleanSight and Siemens Financial Services 25°46′34″S 152°47′42″E / 25.776°S 152.795°E / -25.776; 152.795 1200 Planning approved $2 billion investment, up to 226 turbines[16]
High Road Wind Farm[19] Transfield Services 17°29′32″S 145°28′34″E / 17.4923°S 145.4761°E / -17.4923; 145.4761 50[20] Planning approved $90 million investment, 17 turbines
Kennedy Energy Park Stage 2[7] Windlab 21°S 145°E / 21°S 145°E / -21; 145 43 Feasibility Over $1.5 billion to construct, up to 300 wind turbines.
Kidston Wind Project[21] Genex Power 18°53′06″S 144°08′38″E / 18.885°S 144.144°E / -18.885; 144.144 258 Feasibility Expanded to 258MW in November 2022 [22]
North Stradbroke Island Stanwell Corporation 27°33′18″S 153°27′36″E / 27.555°S 153.460°E / -27.555; 153.460 15 Proposed
Windy Hill Wind Farm Stage 2 Proposed by Transfield Services 17°35′32″S 145°31′50″E / 17.5922°S 145.5306°E / -17.5922; 145.5306 12 Cancelled
MacIntyre Wind Farm Acciona & CleanCo 28°20′20″S 151°30′25″E / 28.339°S 151.507°E / -28.339; 151.507 1026[23] Commissioned Located in Cement Mills
MacIntyre Wind Farm Herries Range Acciona 29°46′34″S 153°54′22″E / 29.776°S 153.906°E / -29.776; 153.906 1000[24]
Lakeland Wind Farm Windlab 100 Planning approved [25][26][27]
Banana Range Wind Farm Lacour 24°32′00″S 150°18′57″E / 24.5333°S 150.3158°E / -24.5333; 150.3158 230 Planning approved Construction start expected Q1 2024[28]
Kingaroy Wind Farm Australia Energy Windfarm 57.12 Feasibility [29][30]

See also

[edit]

References

[edit]
  1. ^ Green, Glenis (14 August 2008). "South Burnett poised to host power generator giant". The Courier-Mail.
  2. ^ "AGL's $14m windfarm tilt". Business Day. 10 December 2008. Retrieved 18 December 2008.
  3. ^ "Coopers Gap Wind Farm". AGL. Retrieved 5 December 2016.
  4. ^ "Coopers Gap Wind Farm".
  5. ^ "Wind Farm Development at Mt Emerald". AZoCleantech. Retrieved 6 November 2010.
  6. ^ webk. "Kaban Green Power Hub". Retrieved 23 January 2019.
  7. ^ a b "Kennedy Wind Farm". windlab. Archived from the original on 18 July 2010. Retrieved 26 July 2011.
  8. ^ Vorrath, Sophie (12 March 2020). "Windlab extends truce with contractors in Kennedy Energy Park dispute". RenewEconomy.
  9. ^ "The Project". Clarke Creek Wind and Solar Farm project. Retrieved 10 August 2018.
  10. ^ "Billion-dollar wind farm approved in central Queensland". ABC News. 6 June 2018. Retrieved 10 August 2018.
  11. ^ "AEMO Proposed Generation Projects". Australian Energy Market Operator. Archived from the original on 25 July 2011. Retrieved 26 July 2011.
  12. ^ Stuart Cumming (2 February 2011). "Crows Nest wind farm to go ahead". The Toowoomba Chronicle. Toowoomba Newspapers Pty Ltd. Retrieved 28 June 2011.
  13. ^ "Construction starts on Australia's largest wind farm". South Burnett Times. Retrieved 30 June 2019.
  14. ^ "Development Pipeline". Infigen Energy. Retrieved 5 June 2017.
  15. ^ "Infigen waiting on outcome of Ergon Energy renewable energy tender". North Queensland Register. Retrieved 5 June 2017.
  16. ^ a b "Forest Wind". Forest Wind. Retrieved 22 December 2019.
  17. ^ Mazengarb, Michael (19 December 2019). "Massive 1,200MW Wide Bay wind farm gets kick start from state government". RenewEconomy. Archived from the original on 22 December 2019. Retrieved 22 December 2019.
  18. ^ "Job-generating Wide Bay wind farm proposal gaining momentum - The Queensland Cabinet and Ministerial Directory". statements.qld.gov.au. Retrieved 22 December 2019.
  19. ^ Johannesen, Terry. "High Road Wind Farm". Transfield Services. Archived from the original on 28 March 2012. Retrieved 26 July 2011.
  20. ^ "Transfield Services adds to its wind farm development portfolio". Transfield Services. Archived from the original on 28 September 2011. Retrieved 26 July 2011.
  21. ^ "150MW Kidston Wind Project". Genex Power. Retrieved 27 July 2018.
  22. ^ "Kidston Stage 3 Wind Project Update" (PDF). Australian Financial Review. Retrieved 9 December 2022.
  23. ^ "MacIntyre Find Farm Fact Sheet" (PDF). Acciona. Retrieved 28 December 2021.
  24. ^ "MacIntyre Find Farm Fact Sheet".
  25. ^ "lakeland-wind-farm". lakeland-wind-farm. Retrieved 9 August 2019.
  26. ^ Parkinson, Giles (23 July 2019). "Queensland shortlists 10 big renewable and storage projects for CleanCo contracts". RenewEconomy. Retrieved 9 August 2019.
  27. ^ "Windlab making headway on Lakeland development". Industry Queensland. 17 June 2019. Retrieved 9 August 2019.
  28. ^ "Banana Range Wind Farm". Banana Range Wind Farm. Retrieved 9 December 2022.
  29. ^ "Kingaroy Wind Farm Plans Unveiled". southburnett.com.au. 9 May 2019. Retrieved 19 August 2019.
  30. ^ "AUSTRALIA ENERGY WINDFARM". auswindfarm.com. Retrieved 19 August 2019.
[edit]